Skip to content

Methodology

Twelve principles. One methodology. Applied across an entire business network.

Codified during the Unique Phuket network migration programme. Every case study is an instance of this workflow.

  1. 01

    Audit-first

    No implementation until discovery and audits are complete and signed off. Every downstream decision cites an audit artefact.

  2. 02

    Historical URL discovery

    Every migration starts with the union of live crawl, Wayback, Google Search Console and Semrush backlink targets. Every URL classified: keep, 301, or 410.

  3. 03

    Redirect philosophy

    301 is a promise a URL has moved. 410 is an admission it was never worth preserving. No chains, no loops, no homepage dumping.

  4. 04

    301 vs 410 decision framework

    Backlinks OR meaningful GSC impressions OR memorable slug ⇒ 301 to nearest live equivalent. Else 410. Applied per URL, not per pattern.

  5. 05

    Entity-first schema

    Every entity defined once with a stable @id. Sibling brands reference by @id; they do not redefine each other.

  6. 06

    Network schema

    Cross-site relationships modelled with owns / subOrganization / parentOrganization using each brand's canonical @id, which must resolve to a live document that back-references the entity.

  7. 07

    RSS strategy

    Every editorial site publishes /feed.xml and /rss.xml. Missinglettr-compatible. Full content:encoded. Enclosures for hero images. Non-editorial routes excluded.

  8. 08

    Analytics

    GA4 + Microsoft Clarity + Cloudflare. SPA route tracking wired at the router layer. Consent-safe defaults, IP anonymisation, form masking.

  9. 09

    Image migration

    Every image moves into owned CDN storage. Immutable URLs, responsive AVIF and WebP variants, ImageObject schema, image sitemap, RSS enclosures. Filenames preserved.

  10. 10

    GitHub workflow

    One repository per site. Repository is the source of truth. Deployment is downstream of a merge.

  11. 11

    Disaster recovery

    Documented restore paths for content, images, schema, analytics, redirect register and DNS. Target RTO: four hours from a clean environment.

  12. 12

    Post-deployment reconciliation

    Production crawl vs pre-launch inventory. Redirect audit. Schema validation. Internal link audit. GSC re-submission plus 90-day monitoring window.

The methodology is applied in full across every site in the network. Each application is documented in the corresponding case study.